Certified Playground Safety Inspector (CPSI) Practice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the Certified Playground Safety Inspector Exam with flashcards and detailed questions. Each question offers insights and explanations. Get confidently ready for your certification!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


What is the maximum surface slope from horizontal for Stepping Forms?

  1. 20 degrees

  2. 25 degrees

  3. 30 degrees

  4. 35 degrees

The correct answer is: 30 degrees

Stepping forms are structures that provide support for workers on construction sites. They are typically used for pouring concrete and other building materials. The maximum surface slope for stepping forms is 30 degrees. This slope is optimal because it provides enough stability for workers while also allowing for easy removal of the form after the material has been poured. The other options are incorrect because a slope of 20, 25, or 35 degrees could compromise the stability of the form and potentially lead to accidents or errors in the building process. It is important to adhere to the recommended maximum slope for stepping forms in order to ensure the safety and efficiency of construction projects.